Skip to Main Content
Utility Master Plans

The Office of Facilities, Energy Management prepares Utility Master Plans for all three campuses. The plans are prepared in conjunction with Collegewide Campus Master Plans in order to provide life cycle cost effective utility infrastructure to meet the existing and future needs of the College.  Original plans were prepared in the early 1990s and were updated in 2006.

Utilities Examined Are:

            Domestic Water & Fire Water Systems
            Sanitary Sewer Systems
            Storm Water Drainage System
            Central Plant Heating & Cooling Systems
            Fuel Selection & Delivery Systems
            Electrical Systems
            Information Technology Facilities Infrastructure Systems

These plans are available for review in the Office of Facilities, Central Administration.

Downloads:

1. Rockville Campus Utility Master Plan Vol 1 (May 31, 2006) (PDF - 1.4MB)

2. Rockville Campus Utility Master Plan Vol 2 (May 31, 2006) (PDF - 29.6MB)

3. Germantown Campus Utility Master Plan Vol 1 (May 31, 2006) (PDF - 1.8MB)

4. Germantown Campus Utility Master Plan Vol 2 (May 31, 2006) (PDF - 23.6MB)

4A. Germantown Campus Central Chilled Water Plant Study (January 8, 2007) (PDF - 10.2MB)

4B. Germantown Campus Bioscience Education Center DD Energy Analysis (Sept 2009) (PDF - 10.9MB)

5. Takoma Park/Silver Spring Campus Utility Master Plan Vol 1 (May 31, 2006) (PDF - 2.4MB)

6. Takoma Park/Silver Spring Campus Utility Master Plan Vol 2 (May 31, 2006) (PDF - 22.6MB)

7. 40 West Gude Drive, HVAC Study (PDF - 10.2MB)

 

Contact Us:
  • Central Facilities
  • 40 West Gude Drive, Suite 200
  • Rockville, MD 20850

Montgomery College

Montgomery County, MD

240-567-5000

©2014, Montgomery College